Ordered in March but only just experienced it fitted resulting from reliance on trades and prepping the area ready which comprised of ripping aged plasterboard and toilet out and redoing as a fresh utility with new electrics. Very major toilet that looks good inside the smaller space I'd manufactured. Just https://alicek802egg5.national-wiki.com/user